Safety and compliance

The permit is part of the job.

Clients get the confidence of knowing Earthed was there.

Licence

Earthed High Voltage Pty Ltd

SA electrical contractor licence PGE 336477.

ABN 99 679 180 879. ACN 679 180 879.

Where an asset owner requires its own authorisation, switching is done inside that permit. The sheets, the permits and the ePermit stay with the job.

Technicians at an outdoor containerised high voltage switchboard
  1. 01

    In-house safety system

    We hold a real focus on maintaining a healthy working environment, using our craft to implement strict safe operating procedures inside our in-house safety system.

  2. 02

    Switching authority

    HV operating authority, switching sheets, permits and an in-house ePermit.

  3. 03

    Permit control

    Energisation and handover run on switching programs and permit control. Isolation is held for the service window, then the asset is restored.

  4. 04

    Testing before it goes back

    Switchgear commissioning uses primary and secondary injection. Relay and protection testing covers settings, verification and reporting. Joints are IR and VLF tested before return to service.

  5. 05

    When it faults

    24-hour HV fault response: fault location, re-terminations and return-to-service testing.

Enquiry

Tell us the voltage, the asset and the window.

We do the work most electricians can't.